Home/Industries/Lien Waiver Software for Both Sides of a Draw
Lien Waiver Software

Lien Waiver Software That Gets the Check Released on the First Ask

The GC's accounts payable email says your draw is approved, and then comes the catch: no check until they have your unconditional for last month and a conditional from your rebar supplier for this one. Nothing's wrong with the work. The paperwork just isn't in the right hands yet. Lien waiver software is worth paying for when it produces the right waiver, for the right amount, from the right party, before anyone has to write that email. Which tool does that depends on whether you're the one asking for waivers or the one signing them.

How three missing waivers shrink an owner draw

A GC's view of one month on a commercial job. The same arithmetic lands on every sub whose line was held.

Example owner draw · illustrative amounts
Draw requested from the owner this period $612,000
Electrical sub's conditional progress waiver not received (Line held until it arrives) − $94,000
Framing sub's lumber supplier: no unconditional for last month (A sub-tier waiver, two levels down) − $38,500
Mechanical sub's waiver typed for the wrong amount (Waiver said $71,250, pay app said $94,000) − $22,750
Released to the GC this period $456,750

Some owners and lenders hold the whole draw instead of the affected lines. Either way, every hold above is a document problem, not a work problem, and one of the three, the mechanical sub's, is a figure retyped from the pay app. That's why the waiver amount should come from the construction invoicing software or AP invoice it covers, not from a person filling in a form.

Collecting waivers from your tiers, or signing them for the GC

The two jobs share a document and very little else, so a tool built for one tends to feel awkward for the other.

You collect them

GCs and upper-tier subs paying others

  • Levelset, now owned by Procore, requests conditional and unconditional waivers from subs and their own vendors, and can push received waivers into the Procore project's documents.
  • Procore Pay runs waiver signatures through Levelset if you already pay subs in Procore.
  • What matters: how deep it reaches into sub-tiers, and whether a payment can be checked against the waivers it needs before release.
You sign them

Subs billing a GC every month

  • Siteline builds the pay app and the matching waivers from the same numbers, and submits to GC portals including Textura and Procore Pay.
  • On a job where the GC runs payments through Oracle Textura, you'll sign and submit waivers inside Textura, whatever you use on other jobs.
  • What matters: waivers generated from the billing figures, and an unconditional held back until the payment really lands.

If you're a sub on some jobs and the payer on others, start from the side with more waivers each month. The other side can often run on the GC's own portal or a lighter process.

Six things to pin down with a waiver vendor before the next billing cycle

  • Which states does its form library carry, and who updates it?

    Some states publish their own waiver forms. Ask for the exact list of states you work in, and how you'd learn a form changed.

  • How many tiers deep can it request and track?

    A supplier to a sub's sub is where waivers go missing. If the tool stops at your direct subs, someone's still chasing the rest by email.

  • Where does the waiver amount come from?

    If it's typed, you'll get the mechanical-sub mistake above. It should come from the pay app or the AP invoice it covers.

  • Does it hold back the unconditional until payment clears?

    Signing an unconditional before the money's in hand is the risk subs fear most. The tool should prompt the right form from the payment's status.

  • Does it track preliminary notices and lien deadlines too?

    They're part of the same payment protection, and a separate calendar for them is one more thing to forget.

  • Where do signed waivers end up?

    In the project file, the accounting system or both. Certificates of insurance usually travel with them, which is why some firms pair this with COI tracking software.

Lien waiver questions from PMs and AP clerks

Does lien waiver software also handle preliminary notices and deadlines?

Some does. Levelset tracks preliminary notice and lien deadlines next to waivers, which makes sense, since a missed notice can cost the protection a waiver is meant to settle. Siteline is built around a sub's billing and the waivers that go with it. If notices matter in your states, ask each vendor that question first.

What's the real difference between a conditional and unconditional waiver, and does the software know which to use?

A conditional waiver generally takes effect only once the named payment clears; an unconditional one takes effect when it's signed. Each comes as a progress or a final version, so there are four in all. Good tools choose the form from where the payment stands, so nobody signs an unconditional early. State rules vary, so confirm yours with counsel.

We're a sub on some jobs and a GC-side payer on others. Does one platform cover both?

Sometimes, though rarely equally well, since collecting waivers and signing them are different workflows. Pick the tool for the role that produces more waivers each month, then check how it handles the other. On jobs where the GC uses Textura or Procore Pay, you'll sign in their system anyway.

How long does it take to get a lien waiver system actually running on live jobs?

A few weeks for a single-tier operation with jobs in one or two states. Several states and deep sub-tiers take longer, because each state's forms and each job's tier contacts need setting up and checking before the first live cycle.

Who actually sets this up for us, you or the software vendor?

n-frames does the setup on your side: each state's forms loaded and tested, sub-tier contacts mapped job by job, and waiver amounts tied to your pay apps or AP invoices. Where your tiers go deeper than the tool tracks, we build the tracking that follows them.

Is this worth it for a smaller GC or sub, or only larger operations?

It's the waiver count that matters, not headcount. A five-person sub signing twenty waivers a month across three GCs has more to lose to a held payment than a bigger firm with two jobs.